---
source_url: "https://www.sarne-eng.co.il/index_en.html?utm_source=openai"
title: Sarne Engineering Ltd.
mirrored_at: 2026-08-29T13:02:18.285Z
host: www.sarne-eng.co.il
cited_in_42a: true
mirror_canonical: "https://index.42a.ai/www.sarne-eng.co.il/index_en.html__q__utm_source_openai"
---

> **Original source:** https://www.sarne-eng.co.il/index_en.html?utm_source=openai

![](https://www.sarne-eng.co.il/images/bullet.gif)  David Sarne – Founder and Chairman  [resume](https://www.sarne-eng.co.il/david_CV.html)  
![](https://www.sarne-eng.co.il/images/bullet.gif)  Mickey Sarne – Owner and CEO  [resume](https://www.sarne-eng.co.il/mickey_CV.html)

## Expert Engineering Services,  
Consulting and Project Management:

**Public-Private Partnerships - BOT & PFI Projects:**  

-   Lenders' Technical Advisors (LTA)
-   Technical Due-Diligence
-   Risk Assessment
-   Project Monitoring and Control – Schedule,  
    Budget, Quality

**Civil Engineering - Management, Supervision  
and Coordination:**

-   Infrastructure
-   Structures
-   Bridges

**Professional Arbitration and Mediation**

**Tourism Development Initiatives and Projects:** through [Tourism Engineering](http://tourism-eng.co.il/english/home-page)

## Projects and Clients

-   ![](https://www.sarne-eng.co.il/images/bullet.gif)  I.D.F. Training Center PFI
    
    A unified, multi-discipline training center for the Israeli Defense Forces, 250,000 sq.m, $420M, design and construction: 2012-2016. Operation in stages since 2015. **LTA to Bank Hapoalim.**
    
-   ![](https://www.sarne-eng.co.il/images/bullet.gif)  Assuta Ashdod Hospital PFI
    
    Design, construction and operation of a public hospital in the city of Ashdod, the 5th largest city in Israel, 60,000 sq.m, $180M, under construction since 2013. **LTA to Bank Leumi.**
    
-   ![](https://www.sarne-eng.co.il/images/bullet.gif)  Cross Israel Highway BOT (Highway no. 6)
    
    The first BOT toll road in Israel. Central Section, 88 km, $800M, constructed: 1999-2002. **LTA to CIT (Canada) and Bank Hapoalim, in cooperation with ARUP (UK).**  
    Northern extension (section 18) constructed: 2007-2009. Expansion of the central section: since 2008.  
    **LTA to Bank Hapoalim and CIT (Canada).**
    
-   ![](https://www.sarne-eng.co.il/images/bullet.gif)  Israeli Police Training Center PFI (POLICITY)
    
    A unified, multi-discipline training center for the Israeli Police, 60,000 sq.m, $140M, constructed: 2012-2014. Operational since 2015.  
    **LTA to Bank Discount.**
    
-   ![](https://www.sarne-eng.co.il/images/bullet.gif)  Dalia Energies CCPP BOT
    
    870MW Combined Cycle Power Plant, $620M, constructed: 2012-2015.  
    **LTA to Bank Leumi in cooperation with POYRY (Italy).**
    
-   ![](https://www.sarne-eng.co.il/images/bullet.gif)  Ashdod Desalination SWRO Plant BOT
    
    100M cu.m seawater reverse osmosis plant, $345M, constructed: 2011-2015.  
    **Local LTA to Bank Hapoalim in cooperation with  
    NT WATERPROS (Cyprus) and BATTUS (UK).**
    
-   ![](https://www.sarne-eng.co.il/images/bullet.gif)  Rehabilitate Operate Transfer PFI
    
    Rehabilitation and Operation of existing roads in Israel, 270 km, $250M, starting from 2010.  
    **LTA to Bank Discount.**
    
-   ![](https://www.sarne-eng.co.il/images/bullet.gif)  Highway 431 PFI
    
    3 lane expressway that forms the southern part of the Tel Aviv metropolitan ring road, 22 km, $400M, constructed: 2005-2009.  
    **LTA to Bank Hapoalim.**
    
-   ![](https://www.sarne-eng.co.il/images/bullet.gif)  Carmel Tunnels BOT
    
    Toll road crossing the Haifa metropolitan area with Israel's longest vehicle tunnels and connecting bridges, 2x5.6 km, $220M, constructed: 2007-2010.  
    **LTA to Bank Discount in cooperation with ARUP (UK) - during construction phase.**
    
-   ![](https://www.sarne-eng.co.il/images/bullet.gif)  Jerusalem Light Rail BOT
    
    The first Light Rail System in Israel, 14 km, $800M,  
    constructed: 2006-2011.  
    **LTA to Bank Hapoalim and Bank Leumi.**
    
-   ![](https://www.sarne-eng.co.il/images/bullet.gif)  Tel Aviv Light Rail BOT
    
    The Red Line, at grade and underground, the first line of the future Tel Aviv Metropolitan Light Rail System, 22 km with 14.2 km twin tunnels, $2B.  
    **Local LTA to the MLAs (including KfW, Bayern LB, Bank Leumi), in cooperation with CAPITA SYMONDS (UK).**
    
-   ![](https://www.sarne-eng.co.il/images/bullet.gif)  Ben-Gurion Airport Cargo Terminal BOT
    
    The largest cargo terminal in Israel, $20M,  
    constructed: 2005-2007.  
    **LTA to Bank Leumi (Israel).**
    
-   ![](https://www.sarne-eng.co.il/images/bullet.gif)  Kessem Interchange
    
    Main interchange of the Cross-Israel Highway, a preliminary  
    stage of the BOT project, $50M, constructed: 1996-1999.  
    **Project Management.**
    
-   ![](https://www.sarne-eng.co.il/images/bullet.gif)  Ayalon Highways
    
    The only highway crossing the city of Tel Aviv and connecting  
    its northern and southern suburbs, 30 km, constructed in parts since 1972.  
    **Structural design management, coordination, supervision, project management and construction management.**