## Key Project Features

-   Total of 16 MVA Feed – with an additional back-up utility feed of 16 MVA
-   Flexible deployment model with tailored suites from secured pods to full data halls
-   Central location 20 km from Tel Aviv and close to major R&D hubs, and 400m to IEC substation
-   Designed for AI and HPC workloads with Direct Liquid Cooling and dedicated piping for CDUs
-   Fortified underground facility engineered to withstand direct missile impact
-   High security level with 24/7 armed guards
-   Sustainable design targeting LEED Gold certification
-   72 hours of autonomous operation capability

לפתיחת התמונה בגדול -

לפתיחת התמונה בגדול -

לפתיחת התמונה בגדול -

לפתיחת התמונה בגדול -

לפתיחת התמונה בגדול -

\- פתח וידאו בפופאפ

\- פתח וידאו בפופאפ

## Partnership & Certifications

partnerships לפתיחת התמונה בגדול - Levinstein

partnerships לפתיחת התמונה בגדול - Mochly Eldar

partnerships לפתיחת התמונה בגדול - Electra

partnerships לפתיחת התמונה בגדול - Kyndryl