> **Original source:** https://www.mordorintelligence.com/industry-reports/israel-data-center-construction-market

![Israel Data Center Construction Market Summary](https://s3.mordorintelligence.com/israel-data-center-construction-market/israel-data-center-construction-market-size-image-1735471712042.webp "Israel Data Center Construction Market Size")

Image © Mordor Intelligence. Reuse requires attribution under CC BY 4.0.

## Israel Data Center Construction Market Trends and Insights

### The IT and Telecom Segment is Expected to Have Significant Market Share in the Coming years

-   The IT and telecom segment in the Israeli data center market reached an IT load capacity of 20 MW in 2023. It is expected to register an annual growth of 13.8% to reach a capacity of 48.3 MW by 2029. In April 2024, as per official documents, the Israeli Ministry of Defense established a dedicated "landing zone" within Google Cloud. This zone is a secure gateway to Google's computing infrastructure, enabling the ministry to store and process data and utilize AI services.
-   According to a draft contract dated March 2024, the Israeli Ministry of Defense engaged Google's consulting services to improve its Google Cloud access. The aim was to enable various units within the ministry to leverage automation technologies. The contract details a billing of over USD 1 million from Google to the Israeli Ministry of Defense for these services.
-   In August 2023, Amazon.com unveiled a strategic move, committing approximately USD 7.2 billion in investments in Israel, slated to span until 2037. Simultaneously, it inaugurated its Amazon Web Services (AWS) data centers within the nation. These data centers will empower the Israeli government, granting them the capability to both run applications and securely store data within Israel's borders. Yali Rothenberg, Israel's accountant general, expressed optimism, noting that the establishment of this regional infrastructure will facilitate a significant migration of governmental workloads to the cloud. This, he believes, will play a crucial role in speeding up the country's digital transformation in the public sector.
-   Israel intensifies its telecom growth efforts by rolling out a 5G network. A notable milestone was reached in April 2024, as Pelephone, in collaboration with Ericsson, unveiled Israel's inaugural independent 5G network core. This venture, dubbed the MAX G5 network, was backed by an investment of around NIS 50 million.
-   Such market instances create more data needs in the coming years. This surge in data storage demand is poised to elevate the need for data centers in the region, thereby bolstering the prospects of data center construction firms in the coming years.

![Israel Data Center Construction Market - 5G Download and Upload Speed, In Mbps, Israel, By December 2023](https://s3.mordorintelligence.com/israel-data-center-construction-market/1728982318447-israel-data-center-construction-market-5G-Download-and-Upload-Speed-In-Mbps-Israel-By-December-2023.png "Israel Data Center Construction Market Trends")

Image © Mordor Intelligence. Reuse requires attribution under CC BY 4.0.

![](https://www.mordorintelligence.com/express-img/images/mobile/cta-1-mobile.svg)

![](https://www.mordorintelligence.com/express-img/images/desktop/cp-mi-5.svg)

### The Tier 3 Segment is Expected to Hold the Major Share in the Country

-   In 2023, there were around 16 data centers in Israel with Tier 3 certification, with a cumulative IT load capacity of 167.4 MW. Reliability and affordability are the major factors driving the demand for tier 3 data centers in the country. The Tier 3 segment is projected to register an annual growth rate of 9.1%, reaching around 327 MW by 2030.
-   In 2023, Tel Aviv dominated the Tier 3 certified data center landscape, with Adgar leading the pack, boasting an IT load capacity of 107.9 MW across two facilities. Bezeq International Ltd is closely followed by 32.5 MW distributed over six facilities. Serverfarm LLC operated a single facility with a 10 MW IT load. EdgeConneX Inc. managed 7.7 MW under one facility, while other players in the market held smaller shares.
-   During the study period, Tel Aviv is set to see the construction of about five data center facilities, all meticulously designed to adhere to Tier 3 standards. These strategic facilities are poised to add over 60 MW of IT load capacity to the region.
-   Throughout the study period, key players plan to invest in data centers, including Digital Realty, Lian Group, and MedOne. These developments in the Israeli market are expected to amplify the demand for Tier 3 certified data centers. This heightened demand, particularly within the Tier 3 category, is expected to fuel the necessity for data center construction services in the coming years.

![Israel Data Center Market, Tier 3 Type, IT Load, MW, 2021-2024](https://s3.mordorintelligence.com/israel-data-center-construction-market/1728982333206-israel-data-center-construction-market-Israel-Data-Center-Market-Tier-3-Type-IT-Load-MW-2021-2024.png "Israel Data Center Construction Market Trends")

Image © Mordor Intelligence. Reuse requires attribution under CC BY 4.0.

![](https://www.mordorintelligence.com/express-img/images/mobile/cta-3-mobile.svg)

![](https://www.mordorintelligence.com/express-img/images/desktop/cp-mi-5.svg)

## Competitive Landscape

The Israeli data center construction market is fairly consolidated, with significant companies such as AECOM, James L Williams Middle East., Electra Group, Electra Group, and Minrav Group Ltd.

February 2024: MedOne, an Israeli data center firm, constructed two novel underground data centers on the outskirts of Tel Aviv. These centers, spanning three underground levels, will collectively cover about 30,000 square meters (322,920 square feet). The inaugural data center, situated north of Tel Aviv, is slated for a 2026 debut, with its counterpart set to follow suit in 2027.

## Israel Data Center Construction Industry Leaders

1.  AECOM
    
2.  James L Williams Middle East.
    
3.  Electra Group
    
4.  Minrav Group Ltd
    
5.  eXp Israel
    
6.  \*Disclaimer: Major Players sorted in no particular order

![Israel Data Center Construction Market Concentration](https://s3.mordorintelligence.com/israel-data-center-construction-market/israel-data-center-construction-market_1692003752133_ISrael.webp "Israel Data Center Construction Market Concentration")

Image © Mordor Intelligence. Reuse requires attribution under CC BY 4.0.

![](https://www.mordorintelligence.com/express-img/images/mobile/cta-4-mobile.svg)

![](https://www.mordorintelligence.com/express-img/images/desktop/cp-mi-5.svg)

## Recent Industry Developments

-   January 2024: The Swiss fund, Lian Group, teamed up with Europe-Israel Group and PAI to develop a NIS 400 million (USD 122.5 million) facility on a 6.25-acre plot in Afula, a city in northern Israel. The consortium acquired the land south of Nazareth for NIS 80 million (USD 24.5 million) approximately six months ago. Construction commenced toward the end of 2021, with a projected completion timeline of 2025 or 2026. The group has enlisted the services of Spector Amisar Architects.
-   April 2023: EdgeConneX, in a strategic move, enlarged its data center network in south Tel Aviv, Israel. The firm is constructing its third data center in Israel, bolstering its IT capacity by 7.5 MW. Situated in Rishon, this new facility will synergize with EdgeConneX's current establishments, which span two locations in Herzliya to the city's north and Petah Tikva to the east. Collectively, these sites will amass a substantial 14.5 MW capacity.

## Table of Contents for Israel Data Center Construction Industry Report

1\. INTRODUCTION

-   1.1 Study Assumptions And Market Definition
-   1.2 Scope of the Study

2\. RESEARCH METHODOLOGY

-   2.1 Research Framework
-   2.2 Secondary Research
-   2.3 Primary Research
-   2.4 Data Triangulation and Insight Generation

3\. EXECUTIVE SUMMARY

4\. MARKET INSIGHT

-   4.1 Market Overview
-   4.2 Market Dynamics
    -   4.2.1 Market Drivers
    -   4.2.1.1 Increasing Investments in Cloud Technologies, Fueled by the Growing Adoption of AI, are Driving the Demand for Data Centers in the Irish Market.
    -   4.2.1.2 The Israel government's digital initiatives have fueled a surge in the demand for data centers.
    -   4.2.2 Market Restraints
    -   4.2.2.1 High Power Consumption and Emission Contribution of Data Centers
-   4.3 Industry Attractiveness - Porter's Five Forces Analysis
    -   4.3.1 Bargaining Power of Suppliers
    -   4.3.2 Bargaining Power of Consumers
    -   4.3.3 Threat of New Entrants
    -   4.3.4 Threat of Substitutes
    -   4.3.5 Intensity of Competitive Rivalry
-   4.4 Key Israel Data Center Construction Statistics
    -   4.4.1 Number of Data Centers In Israel, 2022 and 2023
    -   4.4.2 Data Center Under Construction in Israel, In MW, 2024 - 2029
    -   4.4.3 Average Capex and Opex For the Israel Data Center Construction
    -   4.4.4 Data Center Power Capacity Absorption In MW, Selected Cities, Israel, 2022 and 2023
    -   4.4.5 The Top CAPEX Spenders on Data Center infrastructure in Israel

5\. MARKET SEGMENTATION

-   5.1 Market Segmentation - By Infrastructure
    -   5.1.1 Market Segmentation - By Electrical Infrastructure
    -   5.1.1.1 Power Distribution Solution
    -   5.1.1.1.1 PDU - Basic and Smart - Metered and Switched solutions
    -   5.1.1.1.2 Transfer Switches
    -   5.1.1.1.2.1 Static
    -   5.1.1.1.2.2 Automatic (ATS)
    -   5.1.1.1.3 Switchgear
    -   5.1.1.1.3.1 Low-voltage
    -   5.1.1.1.3.2 Medium-voltage
    -   5.1.1.1.4 Power Panels and Components
    -   5.1.1.1.5 Other Power Panels and Components
    -   5.1.1.2 Power Backup Solutions
    -   5.1.1.2.1 UPS
    -   5.1.1.2.2 Generators
    -   5.1.1.3 Service - Design and Consulting, Integration, Support, and Maintenance
    -   5.1.2 Market Segmentation - By Mechanical Infrastructure
    -   5.1.2.1 Cooling Systems
    -   5.1.2.1.1 Immersion Cooling
    -   5.1.2.1.2 Direct-to-chip Cooling
    -   5.1.2.1.3 Rear Door Heat Exchanger
    -   5.1.2.1.4 In-row and In-rack Cooling
    -   5.1.2.2 Racks
    -   5.1.2.3 Other Mechanical Infrastructure
    -   5.1.3 General Construction
-   5.2 Market Segmentation - By Tier Type
    -   5.2.1 Tier 1 and 2
    -   5.2.2 Tier 3
    -   5.2.3 Tier 4
-   5.3 Market Segmentation - By End User
    -   5.3.1 Banking, Financial Services, and Insurance
    -   5.3.2 IT and Telecommunications
    -   5.3.3 Government and Defense
    -   5.3.4 Healthcare
    -   5.3.5 Other End Users

6\. COMPETITIVE LANDSCAPE

-   6.1 Company Profiles
    -   6.1.1 AECOM
    -   6.1.2 James L Williams Middle East
    -   6.1.3 Electra Group
    -   6.1.4 Minrav Group Ltd
    -   6.1.5 eXp Israel
    -   6.1.6 HHM Building Contracting
    -   6.1.7 Turner & Townsend
    -   6.1.8 Mevanah Real Estate (KD) Ltd
    -   6.1.9 Mace Group
-   **\*List Not Exhaustive**

7\. INVESTMENTS ANALYSIS

8\. MARKET OPPORTUNITIES AND FUTURE TRENDS

9\. ABOUT US

-   9.1 Industries Covered
-   9.2 Illustrative List of Clients in the Industry
-   9.3 Our Customized Research Capabilities

\*\*Subject to Availability

![](https://www.mordorintelligence.com/express-img/images/mobile/cta-5-mobile.svg)

![](https://www.mordorintelligence.com/express-img/images/mobile/cs-mi-4.svg)

## Israel Data Center Construction Market Report Scope

Data center construction combines physical processes used to construct a data center facility. It chains construction standards with data center operational environment requirements.

The Israeli data center construction market is segmented by infrastructure (electrical infrastructure (power distribution solutions (PDU, transfer switches, switchgear, power panels, and components)), power backup solutions (UPS and generators), service - design and consulting, integration, and support and maintenance)), (mechanical infrastructure (cooling systems (immersion cooling, direct-to-chip cooling, rear door heat exchanger, and in-row and in-rack cooling)), racks, and other mechanical infrastructure)), and general construction)), and tier type (Tier 1 and 2, Tier 3, and Tier 4), and end user (banking, financial services and insurance, IT and telecommunications, government, defense, healthcare, and other end users). The market sizes and forecasts are provided in value (USD) for all the above segments.

**Market Segmentation - By Infrastructure**

Market Segmentation - By Electrical Infrastructure

Power Distribution Solution

PDU - Basic and Smart - Metered and Switched solutions

Transfer Switches

Static

Automatic (ATS)

Switchgear

Low-voltage

Medium-voltage

Power Panels and Components

Other Power Panels and Components

Power Backup Solutions

UPS

Generators

Service - Design and Consulting, Integration, Support, and Maintenance

Market Segmentation - By Mechanical Infrastructure

Cooling Systems

Immersion Cooling

Direct-to-chip Cooling

Rear Door Heat Exchanger

In-row and In-rack Cooling

Racks

Other Mechanical Infrastructure

General Construction

**Market Segmentation - By Tier Type**

Tier 1 and 2

Tier 3

Tier 4

**Market Segmentation - By End User**

Banking, Financial Services, and Insurance

IT and Telecommunications

Government and Defense

Healthcare

Other End Users

Market Segmentation - By Infrastructure

Market Segmentation - By Electrical Infrastructure

Power Distribution Solution

PDU - Basic and Smart - Metered and Switched solutions

Transfer Switches

Static

Automatic (ATS)

Switchgear

Low-voltage

Medium-voltage

Power Panels and Components

Other Power Panels and Components

Power Backup Solutions

UPS

Generators

Service - Design and Consulting, Integration, Support, and Maintenance

Market Segmentation - By Mechanical Infrastructure

Cooling Systems

Immersion Cooling

Direct-to-chip Cooling

Rear Door Heat Exchanger

In-row and In-rack Cooling

Racks

Other Mechanical Infrastructure

General Construction

Market Segmentation - By Tier Type

Tier 1 and 2

Tier 3

Tier 4

Market Segmentation - By End User

Banking, Financial Services, and Insurance

IT and Telecommunications

Government and Defense

Healthcare

Other End Users

![](https://www.mordorintelligence.com/express-img/images/mobile/cta-6-mobile.svg)

![](https://www.mordorintelligence.com/express-img/images/mobile/cs-mi-5.svg)

## Key Questions Answered in the Report

The Israel Data Center Construction Market size is expected to reach USD 1.16 billion in 2025 and grow at a CAGR of 10.54% to reach USD 2.12 billion by 2031.

In 2025, the Israel Data Center Construction Market size is expected to reach USD 1.16 billion.

AECOM, James L Williams Middle East., Electra Group, Minrav Group Ltd and eXp Israel are the major companies operating in the Israel Data Center Construction Market.

In 2024, the Israel Data Center Construction Market size was estimated at USD 1.04 billion. The report covers the Israel Data Center Construction Market historical market size for years: 2019, 2020, 2021, 2022, 2023 and 2024. The report also forecasts the Israel Data Center Construction Market size for years: 2025, 2026, 2027, 2028, 2029, 2030 and 2031.

Page last updated on: October 21, 2024

## Israel Data Center Construction Market Report

Statistics for the 2025 Israel Data Center Construction market share, size and revenue growth rate, created by Mordor Intelligence™ Industry Reports. Israel Data Center Construction analysis includes a market forecast outlook for 2025 to 2031 and historical overview. Get a sample of this industry analysis as a free report PDF download.