---
source_url: "https://danaeng.co.il/en/?utm_source=openai"
title: "Homepage - דנה הנדסה שרותי הנדסה ותשתיות %"
mirrored_at: 2026-08-10T03:34:34.939Z
host: danaeng.co.il
cited_in_42a: true
mirror_canonical: "https://index.42a.ai/danaeng.co.il/en/index__q__utm_source_openai"
---

> **Original source:** https://danaeng.co.il/en/?utm_source=openai

## Leaders in construction and infrastructure

Dana Engineering is proud to have successfully passed a landmark 30 years of some of the biggest and most important national projects in Israel in the fields of transportation infrastructure, residential neighborhood development, industrial areas development and public buildings.  

[Read More](https://danaeng.co.il/en/about-us-danaeng/)

## Leaders in construction and infrastructure

These have been among the most complex and significant projects in Israel, beginning from the initial design stage (including management of statutory procedures and approvals) through their completion and opening for public use.

[Read More](https://danaeng.co.il/en/about-us-danaeng/)

## Dana Engineering by the numbers

30

years of operation

230

project managers, engineers, architects, economists and others

15+

clients in the governmental-public sector

+30+

active national megaprojects

## Our main Projects

![alt](https://danaeng.co.il/wp-content/uploads/2020/01/Asset-11@2x.png)

Light Rail/Green Line | NTA

Work in a dense urban environment in immediate proximity to very old structures and businesses including the handling of environmental and community issues, frequent changes in traffic arrangements during stages of construction, delays due to utility relocations, control over a range of construction sites.

Expediting land availability (relocation of utilities, clearances and expropriations)  
Management of all stages of the design  
Project budget management.  
Construction management of all five project segments  
Timetable management, risk management, tendering processes, etc.  

![alt](https://danaeng.co.il/wp-content/uploads/2020/01/Asset-11@2x.png)

![alt](https://danaeng.co.il/wp-content/uploads/2020/09/DJI_0054_1-1.jpg)

Light Rail/Red Line | NTA

The maximum distance between surface stations will be approx. 500 m. Underground stations will be about a 1 km apart. Work in a dense urban environment in immediate proximity to very old structures, frequent changes in traffic arrangements during stages of construction, delays due to utility relocations, control over approx. 10 construction sites.  

![alt](https://danaeng.co.il/wp-content/uploads/2020/09/DJI_0054_1-1.jpg)

![alt](https://danaeng.co.il/wp-content/uploads/2020/01/-%D7%94%D7%A7%D7%95-%D7%94%D7%A1%D7%92%D7%95%D7%9C-e1642342175291.jpg)

Tel Aviv Light Rail – The Purple Line (Eastern Segment)

Line length: 29 km at grade  
Number of stations: 44  
The line passes through 8 municipal authorities.  
Annual passenger forecast for the year 2030 – 60 million

Work in a dense urban environment in immediate proximity to very old structures and businesses including the handling of environmental and community issues, frequent changes in traffic arrangements during stages of construction, delays due to utility relocations, control over a range of construction sites.

Management and supervision over construction of the eastern segment (Infra 1)  

![alt](https://danaeng.co.il/wp-content/uploads/2020/01/-%D7%94%D7%A7%D7%95-%D7%94%D7%A1%D7%92%D7%95%D7%9C-e1642342175291.jpg)

![alt](https://danaeng.co.il/wp-content/uploads/2021/07/%D7%92%D7%A9%D7%A8-%D7%99%D7%94%D7%95%D7%93%D7%99%D7%AA.jpg)

Yehudit Bridge

Two pedestrian and bicycle ramps integrated into a promenade were built on the bridge.  
The bridge is approx. 110 m long with a peak height of 17.58 m and width of 11 m.  

Work above the most heavily traveled high-speed roadway in the State of Israel (Netivei Ayalon), requiring lane closings and construction staging for short periods of time in order to complete tasks while taking field conditions into consideration.

• General budget management  
• Construction management and supervision through handover  
• Timetable management  
• Progress payment and final payment control

![alt](https://danaeng.co.il/wp-content/uploads/2021/07/%D7%92%D7%A9%D7%A8-%D7%99%D7%94%D7%95%D7%93%D7%99%D7%AA.jpg)

## Let's talk

Please fill out this form and we will contact you shortly